OUR PROJECTS
Roadways
IMATHIA Construcción’s work ranges from the construction of new roads, dual carriageway roads and motorways, to the widening or upgrading of existing roads, including their conservation and maintenance.
IMATHIA Construcción has a multidisciplinary team, capable of providing a quick response to the technical difficulties that may be encountered during the design or development of works.
SEE MORE OF OUR PROJECTS
Extension of the A-30 Dual carriageway road in Murcia
ROADWAYS Murcia A-30 dual carriageway road. Widening of the third lane extension per direction on the dual carriageway road between Murcia and Puerto de la Cadena. The works consisted in widening the
Renovation of the A-460, Ruta de La Plata-Guillena dual carriageway road
ROADWAYS Renovation of the A-460, Ruta de La Plata-Guillena dual carriageway road The works consisted in the reconstruction of the A-460 Ruta de la Plata Dual Carriageway Road, section to Guillena, carrying
Renovation of the road from Valsequillo to Monterrubio de la Serena
ROADWAYS Renovation of the road from Valsequillo (Córdoba) to Monterrubio de La Serena (Badajoz). The works included the excavation, compacting, profiling and skimming of earth for levelling, compacting, profiling and skimming of
Cladding of ditches on the A-2 and medians
ROADWAYS Local Improvement. Cladding of ditches on the A-2, between Km point 70.8 and 139.6, on both margins and medians. La obra objeto del proyecto es la ejecución del revestimiento de cunetas
Redesign of intersection on the N-320. Access to Guadalajara
ROADWAYS Road safety. Redesign of intersection on the N-320, km points 277+000 to 278+000. Section: Access to Guadalajara. The purpose of the project was to improve road safety on the section of
Redesign of access roads to the N-432 (From Badajoz to Granada)
ROADWAYS Road Safety. Redesign of the accesses to the N-432 (from Badajoz to Granada), Km point 190.000 to 224.200. Sections: Peñarroya-Bélmez, Bélmez by-pass and Bélmez-Espiel. The works executed consisted in the creation